Scroll Down

Mobile / Fixed Gas Turbine Power Unit

See more cases >
3D axonometric drawing of the powered vehicle (without enclosure)
Powertrain (power generation core unit)

Function: Core Power Generation and Control System

Load-bearing structure: Class II chassis vehicle, crew-carrying chassis
Control and Safety: Parallel Operation and Grid-Connection System, Fire Suppression Systems
Environmental adaptation structures: lower skirt plate, shock absorber, gas turbine support
Electrical Output: Integrated electrical system for power output and control.
Auxiliary vehicle (supports expansion units)

Function: Fuel replenishment and power output expansion

Load-bearing structure: Class II chassis vehicle, crew-carrying chassis, body and lower skirt panel.
Fuel Supply: Fuel tank and auxiliary fuel system, capable of supporting the main propulsion vehicle in full-load operation for at least 8 hours.
Power Output Expansion: Power cable reel providing a power output interface for connecting to users.
Control and Safety: Control Systems and Fire Suppression Systems
Auxiliary vehicle 3D axonometric drawing
CLQD30B power vehicle
CLQD16B Gas Turbine Power Vehicle
CLQD15A Gas Turbine Power Vehicle
CLQD10B Gas Turbine Power Vehicle

Gas Turbine Auxiliary System

See more cases >
Gas Turbine Auxiliary System
Aerodynamic system
 
Intake system, exhaust system
Ventilation and Fire Protection Systems
 
Containerized system, gas turbine test bench, air intake system, exhaust system, fire protection system
Power supply system
 
Lighting system, power distribution system, signal feedback system
UGT15000 Gas Turbine Auxiliary System
MGT6100 Gas Turbine Auxiliary System
Siemens SGT-300 Gas Turbine Auxiliary System
QD128 Gas Turbine Auxiliary System

Engine Test Bed Aerodynamic System

See more cases >
Aerodynamic System for Aeroengine/Gas Turbine Engine Test Bed
Air system
 
Intake system, exhaust system
Auxiliary equipment
 
Electric soundproof doors, soundproof windows, and sound-absorbing walls
Aerodynamic System of Engine Test Bed
Aerodynamic System of Engine Test Bed
Gas Turbine Engine Test Bed Aerodynamic System
Gas Turbine Engine Test Bed Aerodynamic System

Complex Acoustic Environment

See more cases >
Complex Acoustic Environment
Main noise sources
 
Main plant area, coal-fired boiler area, dust removal/denitrification area, cooling tower area, transformer area, auxiliary equipment workshop area
Power Plant Noise Control
Noise Control for Distributed Energy Stations
Noise Control in the Metallurgical Industry of Steel Mills
Noise Control in the Petrochemical Industry

Supporting for Other Equipment

See more cases >
Cooling Tower Noise Control Equipment
Internal combustion engine supporting equipment
Compressor noise reduction and filtration equipment
Hydrogen production supporting equipment